Hinge.
Rudder control horn.
ENGINE MOUNT INSTALLATION.
1) Locate the items necessary to install the
engine mount included with your model. .
4x30mm.
2) Use four 4x30mm head bolts and four 4mm
washers to attach the engine mount rails to
the firewall. Tighten the screws . Make sure to
use threadlock on the screws to help prevent
them from vibrating loose.
Thread locker glue.
www.seagullmodels.com
off the rear portion of one of the 3 nylon tubes
leaving 1/2" protruding from the rear of the
stopper. This will be the fuel pick up tube.
of silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other end
to the nylon pick up tube.(The silicon tube is
not included).
up at a 45º angle. This tube is the vent tube.
INSTALLING THE STOPPER ASSEMBLY.
1) Using a modeling knife, carefully cut
2) Using a modeling knife, cut one length
3) Carefully bend the second nylon tube
Vent tube.
Fuel fill tube.
Fuel pick up tube.
7
Need help?
Do you have a question about the Turbo Raven and is the answer not in the manual?
Questions and answers