Seagull Models Turbo Raven Assembly Manual page 21

Turbo raven artf by seagull models
Table of Contents

Advertisement

Remove covering.
Epoxy.
1) Put the vertical stabilizer into the in the
top of the horizontal fin. The bottom edge of
the stabilizer should also be firmly pushed
against the top of the horizontal stabilizer.
2) Put the vertical stabilizer back in place.
Using a triangle, check to ensure that the ver-
tical stabilizer is aligned 90º to the horizontal
stabilizer.
Horizontal
90º
Stabilizer.
3) When you are sure that everything is
aligned correctly, mix up a generous amount of
Flash 30 Minute Epoxy. Apply a thin layer to
the fuselage and to the sides and bottom of the
vertical stabilizer mounting area. Apply epoxy
to the bottom of the filler block and to the lower
hinge also. Set the stabilizer in place and re-
align. Double check all of your measurements
once more before the epoxy cures. Hold the
stabilizer in place with T-pins or masking tape
and remove any excess epoxy using a paper
towel and rubbing alcohol. Allow the epoxy to
fully cure before proceeding.
www.seagullmodels.com
ELEVATOR - RUDDER PUSHROD HORN
the same method as with the aileron control
horns.
Vertical
Stabilizer.
the both side of elevator.
C/A glue.
INSTALLATION.
1) Install the elevator control horn using
2) Position the elevator control horn on
Elevator control horn.
Hinge.
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents