Switching-On – Dual (Gas And Electric); Forced Switching-On; Drinks Distribution - Coffee; Time Control - Faema E92 Manual

Hide thumbs Also See for E92:
Table of Contents

Advertisement

English
4.
Switching-on – dual (gas and electric)
The boiler may be heated by both gas and electricity
simultaneously.
In this way the working pressure is reached more rapidly
since the water in the boiler is heated simultaneously by the
electrical heating elements inside the boiler and by the flame
from the burner under the boiler.
5.

Forced switching-on

At the end of the programmed switch-on time the following
message will be displayed:
machine OFF
6.

Drinks distribution - coffee

Remove the filter carrier (21 or 25), clean it of the used coffee
grounds and refill it with 1 or 2 doses of ground coffee,
according to the filter carrier used.
Press the coffee evenly in the filter, using the dose-grinder press.
Remove any coffee grounds from the edges of the filter.
Insert the filter carrier (21 or 25) to the group, locking it firmly
in place. Position the cup (or cups) under the spout (or
spouts) of the filter carrier (21 or 25).
Press the coffee distribution key (26, 27, 28 or 29)
corresponding to the desired dose. The corresponding led
lights up, the coffee will be issued and will stop automatically
upon completion.
Press the continuous/STOP distribution button (30) for a
continuous distribution.
The distribution, both dosed and continuous, may be interrupted
at any time by pressing the continuous/STOP key (30).
This function allows to visualize on the display the duration
of the coffee base drinks of each group of the machine.
For example, if a delivery is made from group 1, the following
message will appear on the display:
GR1
xxx
where "xxx" indicates the time of the delivery in seconds.
Time control (only if the function is active)
51
To switch on, follow the procedures in Paragraph 1.
SWITCHING ON – ELECTRIC and 3. SWITCHING ON – GAS.
When the machine needs to be used, keep a STOP (30) key
pressed down for 10 seconds.
The machine will again be activated for use.
To return to programmed switch-off, check the position of the
mains switch (1), disable it, and then return to the previous
position.
26
27
30
If deliveries are made at the same time (for example, from group
1 and from group 3), the display shows the time of every single
delivery:
GR1
xxx
Once the delivering phase is finished, the data remains
visualized for about 10''; after that the display will return to
show the date and the pressure of the boiler.
Note: the "time control" function is active only in normal
conditions of work of the machine and without any other
message on the display.
English
29
28
25
GR3
xxx

Advertisement

Table of Contents
loading

This manual is also suitable for:

E92a

Table of Contents