APRILIA SL 750 SHIVER Service Station Manual page 48

Hide thumbs Also See for SL 750 SHIVER:
Table of Contents

Advertisement

Maintenance
Using a thickness gauge, measure the
distance between the tip of the crank-
shaft and the valve bowl.
Take note of the measurement.
If valve clearance is not within the tolerance range,
adjust as follows:
Take the engine to the TDC.
Lock the camshafts by using the cor-
responding timing pins.
Specific tooling
020719Y Timing pin
Characteristic
Valve clearance at intake
0.11 - 0.18 mm (0.0043 - 0.0071 in)
Outlet valve clearance
0.16 - 0.23 mm (0.0063 - 0.0091 in)
Remove one camshaft at a time
Leave the other camshaft assembled and blocked by means of the timing pin.
CAUTION
IF BOTH CAMSHAFTS ARE REMOVED, THE ENGINE SPINS MAKING TIMING NECESSARY.
Remove the bowl tappets and the ad-
justment shims using a magnet.
NOTE
GREASE THE BOWL TAPPETS AND THE AD-
JUSTMENT SHIMS PROPERLY EACH TIME
THEY ARE REMOVED.
Replace calibrated pads with a pad
thick enough to correct the valve clear-
ance previously detected.
List of calibrated break pads:
1. Calibrated pad 2.60
2. Calibrated pad 2.65
3. Calibrated pad 2.70
4. Calibrated pad 2.75
5. Calibrated pad 2.80
MAIN - 12
SL 750 SHIVER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents