Caution – Mechanical Loading: Mounting of the equipment in the rack should be
such that a hazardous condition is not achieved due to uneven mechanical loading.
Caution – Circuit Overloading: Consideration should be given to the connection of
the equipment to the supply circuit and the effect that overloading of the circuits
might have on over-current protection and supply wiring. Appropriate
consideration of equipment nameplate power ratings should be used when
addressing this concern.
Caution – Reliable Earthing: Reliable earthing of rackmounted equipment should
be maintained. Particular attention should be given to supply connections other than
direct connections to the branch circuit (for example, use of power strips).
Caution – Slide-rail mounted equipment is not to be used as a shelf or a work
space.
Disassembling Slide-Rails
Complete one of the following procedures before installation:
"Disassemble Bolt-On Slide-Rails" on page 20
■
"Disassemble Tool-less Slide-Rails" on page 21
■
▼ Disassemble Bolt-On Slide-Rails
To remove the mounting brackets from the bolt-on slide-rail assemblies:
1. Unpack the slide-rails.
2. Locate the slide-rail lock at the front of one of the slide-rail assemblies
(
FIGURE 2-1
3. Squeeze and hold the tabs at the top and bottom of the lock while you pull the
mounting bracket out of the slide-rail assembly until it reaches the stop
(
FIGURE 2-1
20
Sun Fire X4170 M2 and X4270 M2 Servers Installation Guide • January 2012
).
).
Need help?
Do you have a question about the Fire X4170 M2 and is the answer not in the manual?