Yamaha YFM7FGPW Service Manual page 449

Hide thumbs Also See for YFM7FGPW:
Table of Contents

Advertisement

2. Voltage
• Connect the pocket tester (DC 20 V) to the
meter assembly coupler as shown.
Positive tester probe → brown 1
Negative tester probe → black/white 2
G/Y
G/R
Y/L
Br
1
• Set the main switch to "ON".
• Measure the voltage (12 V) of brown 1
and black/white 2 at the meter assembly
coupler.
• Is the voltage within specification?
YES
Replace the meter
assembly or ECU.
SIGNALING SYSTEM
Br/B
B/W
2
NO
The
wiring
circuit
from the main switch
to the meter assem-
bly coupler is faulty
and
must
be
repaired.
9 - 44
+
ELEC

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yfm7fgpw 2007

Table of Contents