The Reconform Project dialog opens proposing the creation of two new Change Tracking Tracks :
Pyramix Reconform from Change EDL dialog
Select all Tracks that will have to be reconformed (generally all Tracks in the project).
Tick the Create Changes Tracking Tracks box if these are required.
Click on OK to perform the Reconform.
Conforming and Reconforming : Reconform
21 - 494
Need help?
Do you have a question about the Pyramix and is the answer not in the manual?
Questions and answers