Commissioning

The installer must complete the installation and commissioning checklist below and
make sure this guide is left with you. They must also instruct you in the use and care of
the Neo, and make sure you understand the safety instructions and operation of the
appliance.
The glass dress guard fitted to this appliance reduces the risk of fire and injury and no part of it should be
permanently removed.
WARNING
Checklist
F Appliance positioned in a suitable location (clearances, mantels and surrounds etc.).
F Rinnai flue system installed and tested to ensure effective draw.
F Gas pressure checked and set.
F Burn media installed as per instructions.
F Glass dress guard fitted and customer advised not to remove.
F Appliance tested for correct operation and to ensure no gas leaks.
F Customer instructed on operating procedure and safety requirements.
F Customer advised to service the heater every two years.
20 | Neo operation guide: 11907-E 05-14