Pressure Setting And Marking Of Calibrated Injectors; Checks And Adjustments After Commissioning; Changing The Settings - REMEHA GAS 360 S Installation And Service Manual

Gas-fired boilers
Hide thumbs Also See for GAS 360 S:
Table of Contents

Advertisement

5.4.6

Pressure setting and marking of calibrated injectors

Boilers Gas 360 S/
Nozzle pressure (1st stage + 2nd stage)
Natural gas H
Propane
Start-up pressure
Natural gas H
Propane
Nozzle
Number of nozzles
Natural gas H/E
Propane
Gas flow rate - Stage2
Natural gas H
Propane
(1)
15 °C - 1013 mbar

5.5 Checks and adjustments after commissioning

Carry out all the checks mentioned in the chapter "Checking
and maintenance" (Page: 25).

5.6 Changing the settings

Control panel instructions
04/01/11 - 300005180-001-C
8
mbar
14
mbar
36
mbar
11
mbar
10
7
257B
160B
3
(1)
7.29
m
/h
Kg/h
5.35
GAS 360 S
10
12
14
14
36
36
11
11
10
10
9
11
257B
257B
160B
160B
9.35
11.41
6.87
8.37
14
14
36
11
10
13
257B
160B
13.46
9.88
23