Chapter 8: Maintenance; Routine Maintenance - BCI WW1020 Operation Manual

Smiths medical pulse oximeter operation manual
Table of Contents

Advertisement

Chapter 8: Maintenance

Smiths Medical PM, Inc. products have been designed to operate continuously. However, in order
to ensure a continued high level of performance and safety of operation, routine maintenance
must be performed daily.
The Oximeter Service Manual (
descriptions required for carrying out repairs. The Service Manual is shipped with the monitor.

Routine Maintenance

MAINTENANCE ITEM
WW1090 Li-Ion
rechargeable battery pack
Monitor Surfaces and
Docking Station /Printer
Cables
Reusable SpO
sensor
2
Clinician's Operation Manual
<
WW1923) also contains the circuit diagrams, parts lists, and
RECOMMENDED ACTION
Charge the battery by
connecting AC power to the
monitor.
Replace the rechargeable
battery pack.
Clean and/or disinfect
Clean and/or disinfect
Inspect for signs of damage
or deterioration; replace as
required
Clean and/or disinfect
Chapter 8: Maintenance
MAINTENANCE INTERVAL
When Low Battery Signal is
observed.
After continuous use under
battery power.
After approximately 300 charge
cycles.
As required.
When attaching a new patient.
Daily.
When attaching a new patient.
8-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ww1000Spectro 22o spectro 210

Table of Contents