Completing the installation

To complete the installation, perform the following tasks. Instructions for each task
are in the following sections.
1. Reinstall the blade server into the BladeCenter unit (see Chapter 3, "Installing
2. Turn on the blade server (see "Turning on the blade server" on page 13).
3. After you replace the battery or the system board, reset the system date and
Note: If you have just connected the power cords of your BladeCenter unit to

Installing the blade-server bezel assembly

The following illustration shows how to install the bezel assembly on the blade
server.
Complete the following steps to install the blade-server bezel assembly:
1. Read the safety information beginning on page vii and "Installation guidelines"
2. Connect the control-panel cable to the control-panel connector on the system
3. Carefully slide the bezel assembly onto the blade server as shown in the
38
BladeCenter JS20 Type 8842: Installation and User's Guide
the blade server in the BladeCenter unit," on page 17).
time through the operating system that you installed. For additional information,
see your operating-system documentation.
electrical outlets, you will have to wait until the power-on LED on the blade
server flashes slowly before pressing the power-control button on a blade
server.
Bezel-assembly
release
Control panel
connector
on page 21.
board.
illustration, until it clicks into place.
Bezel-assembly
release
Control-panel
cable

Advertisement

Table of Contents
loading

Table of Contents