1.1.5

Inspecting and Unpacking Each Cabinet

The first task in preparing for installation is inspecting and unpacking the UPS
sections. The UPS and accessory cabinets are shipped bolted to wooden pallets,
as shown in Figures 1---1 or 1---2, and protected with outer protective packaging
material.
Figure 1 ---1. Powerware 9330 (10 kVA ---20 kVA) UPS Cabinet as Shipped on Pallet
Powerware 9330 (10 kVA- -40 kVA) Installation and Operation
164201300 Rev. N 013004