Inspecting And Unpacking Each Cabinet - Powerware BPIV Installation & Operation Manual

10–15 kva/20–30 kva
Table of Contents

Advertisement

1.1.5

Inspecting and Unpacking Each Cabinet

The first task in preparing for installation is inspecting and unpacking the UPS
sections. The UPS and accessory cabinets are shipped bolted to wooden pallets,
as shown in Figures 1---1 or 1---2, and protected with outer protective packaging
material.
Figure 1 ---1. Powerware BPIV (10 kVA ---15 kVA) UPS Cabinet as Shipped on Pallet
Powerware BPIV (10 kVA- -30 kVA) Installation and Operation
164201406 Rev. C 013004
1--3

Advertisement

Table of Contents
loading

Table of Contents