Front View - Powerware 9330 Installation & Operation Manual

10–20 kva/25–40 kva
Table of Contents

Advertisement

BATTERY
BREAKER CB2
MAINTENANCE BYPASS
SWITCH (MBS)
INPUT
BREAKER CB1
AC INPUT TO UPS
RECTIFIER (CB1)
(DUAL INPUT)
(A, B, C)
AC INPUT TO UPS RECTIFIER
AND BYPASS
(SINGLE INPUT)
(A, B, C)
SEE
SHEET 2
AC INPUT TO BYPASS
FOR
(DUAL INPUT)
DETAILS
(A, B, C)
REMOTE
BATTERY
INPUT
AC OUTPUT TO
CRITICAL LOAD
(A, B, C)
NEUTRAL
NOTE: METAL SHIELD COVERING POWER
WIRING TERMINALS AND BATTERY
COMPARTMENT MUST BE REMOVED
TO GAIN ACCESS TO WIRING
TERMINALS.
A ---50
UPS CABINET POWER TERMINALS

FRONT VIEW

GROUND TERMINALS
DESCRIPTION:
LOCATION OF UPS CABINET TERMINALS
POWERWARE 9330 (10 kVA-- 20 kVA)
DRAWING NO:
164201300---8
REVISION:
J
Powerware 9330 (10 kVA- -40 kVA) Installation and Operation
INTERNAL
BATTERIES
SHEET:
1 of 5
DATE:
101502
164201300 Rev. N 013004