Magnum 6K8-Series Industrial Field Switch
Once the latching connectors are aligned properly and the mounting holes are
Step 5.
aligned with stand offs then press slowly and firmly with two fingers (as shown
DSSV
Step 6. Now screw down the daughter board with 6 #440 screws,
so that it holds the daughter board securely. The figure on
the left shows the top view of successfully installed
6KPMV cards inside and the Power Led(pin J5) and
Power supply cable(pin DSSV) connected to the board
pins as shown in Fig 3.6.2g with arrows.
Fig. 3.6.2g Top View: 6KPM Module
installed and insight for connecting two
wires to the right pins
Step 7. Once the installation of granddaughter and
daughter modules is done, the front panel
screen plates of 6KPMV need to be placed
on the face of the module securely and carefully. Now screw down properly the
www GarrettCom com
.
6KPMV Cards into a Magnum 6K8-Series
.
Installation and User Guide 03/06)
36
below in Fig. 3.6.2f)
on the top of the
latching connectors
until the connectors
latched up securely.
Figure 3.6.2f:
Securely
latching up
J5