13. Install six cage or clip nuts as shown in Figure 21. If the rack holes
14. Slide the UPS into the rack. Verify that the rear mounting brackets
15. Secure the front of the cabinet to the rack as shown in Figure 21.
UPS
Optional
EBM
Eaton 9140 UPS (7.5–10 kVA) User's Guide
are square, use six cage nuts. If the rack holes are round, use six
clip nuts.
engage in and slide easily along the inside of the rails.
Figure 21. Securing the Front of the UPS
S
164201622 Rev 3 www.eaton.com/powerquality
INSTALLATION
Position 17
(M6 screw
and cage/
clip nut)
Position 11
Position 8
Position 3 (M5 screw)
Position 2 (M5 screw)
39