Replacing The System Board; Removing / Installing The System Board; Required Tools - Fujitsu PRIMERGY TX100 S3 Core Edition Upgrade And Maintenance Manual

Headless server
Hide thumbs Also See for PRIMERGY TX100 S3 Core Edition:
Table of Contents

Advertisement

14.2

Replacing the system board

Field Replaceable Units (FRU)
Average hardware task duration: 50 minutes
Average software task duration: 10 minutes
When replacing the system board of the PRIMERGY TX100 S3 Core Edition
server, the spare part will be identical to the standard (non-Headless) TX100 S3
system. Therefore, will be necessary to convert the standard system board to a
"Headless" model. The system board replacement procedure always include
the following steps:
Removing the system board
Installing the system board
Converting the system board to the Core Edition version and storing the
system's serial number
Updating the BIOS
Checking operation

14.2.1 Removing / installing the system board

14.2.1.1 Required tools

Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
Replacing the system board:
– Phillips PH2 / (+) No. 2 screw driver
Replacing the system board:
– Magnifying glass for inspecting socket cover springs (recommended)
TX100 S3 Core Edition
Upgrade and Maintenance Manual
System board and components
197

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents