3
Changing the Order of Reserve Jobs
Change the order of the reserve jobs, to give a job higher priority.
1
In the basic options of the touch screen press the [STATUS] key.
The Status screen is displayed.
2
Select the reserve job that you want executed with top priority.
The background of the selected job turns black.
3
Press the [JOB PRIORITY] key as often as necessary to move the
copy job up to the position desired.
4
Press the [OK] key to close the status display.
The basic options are displayed again.
3-22
Initial Steps . . .
Di551/Di650