Distributed Pedestal Parts List Shown With - IBM 4820 Planning, Installation And Service Manual

4820 surepoint solution touch screen monitors
Table of Contents

Advertisement

Distributed pedestal instructions
Mounting bracket
Collar
Pedestal mounting bracket
Metal support bracket
Figure 2-16. Distributed pedestal parts list shown with short pedestal
1. Ensure that the pedestal is secure.
2. Mount the 4820 onto the pedestal:
3. Attach the power cable and video cable to the 4820 display.
4. Install the mounting covers:
2-12
4820 Planning, Installation and Service Guide
a. Place the 4820 display on the distributed pedestal. Make sure that the metal
tabs on the mounting bracket slide into the appropriate slots on the back of
the 4820 display.
b. Secure the 4820 to the mounting bracket using four screws.
Note: Ensure that you have connected the cables to the system unit.
Note: Install the optional audio kit at this time. See "Attaching the audio kit"
on page 2-32.
a. See 1 in Figure 2-17 on page 2-13. Attach the cable cover to the mounting
bracket, snapping the tabs on the sides of the cover into the small holes on
the sides of the bracket.
b. See 2 . Attach the mounting bracket cover to the back of the display. Slide
the tabs on the cover into the appropriate slots in the back of the display
and snap into place.
January 14, 2005
Cable cover
Mounting bracket cover
Trough cover
Trough

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents