Download Print this page

GE GBS2OKB Owner's Manual And Installation Instructions page 31

Icemaker accessory kit

Advertisement

Installation Instructions
_]CONNECT
THE WATER LINE
• Squeeze
the ends of the hose clamp (3) from
the kit with pliers and slide the clamp over the
water tube inlet.
• While still squeezing
the clamp, insert the
plastic water line into the inlet as tar as it will
go (approximately
1" [95 mm]).
• Then
slide the clamp downward
to capture
the
plastic water line in place.
• Make sure the fill tube is aimed
down.
• If the condenser
moundng
screw was removed,
secure the condenser
to the refrigerator
by
replacing
the mounting
clip and screw.
DO NOT OVER-TIGHTEN
THE SCREW.
Watertube
inlet
[] WATER VALVE INSTALLED
Refer to the Water
Line Installation
Instructions
for connection
to the home
water supply. After
water line installation
is completed,
set the
icemaker
power switch to I (on).
The icemaking cycle will not begin until the icemaker
and f_ezer
compartment
reach operating temperature,
then icemaking will begin automatically.
[_A1-FACH THE PLASTIC
WATER LINE
Fasten the plastic water fine to the back of the
cabinet
with adhesive-backed
fasteners
(5), spacing
the fasteners
as shown to take up the slack in the
line. (It may be necessary
to remove
the screw from
the top right condenser
mounting
clip for better
access to the water tube inlet).
) Adhesive-backed fasteners
for plasticwaterline
25

Advertisement

loading