Download Print this page

GE GBS2OKB Owner's Manual And Installation Instructions page 29

Icemaker accessory kit

Advertisement

Installation Instructions
[] POWER CORD ADAPTER
There are two power cord adapters included
with the
kit; be sure to use the one specified in the Parts List on
page 7. Plug the female end of the power cord adapter
(19) onto the male terminals
on the icemaker
power
cord. When connecting
the adapter
to the power
cord, make sure the seal is in place between the
connectors.
Secure the power cord adapter
to the
icemaker
by putting it into the hook at the back of
the icemaker
and attaching
it to the icemaker
with
awire lie (22).
[] INSTALL THE ICEMAKER FILL CUP
Install the icemaker fill cup (side-mounted)
(18) into
the icemaker as shown.
[]PLUG
IN THE ICEMAKER
Place the icemaker
on its side as shown.
Insert
the
icemaker
power cord plug (B) into the socket,
making
sure the prongs
and holes are matched.
Press the plug firmly into the socket.
I
¢
[] MOUNT ICEMAKER
• Lift the icemaker
so the fill tube (16) fits in the
f'dl cup opening
(C). Hang
the icemaker
on the
two mounting
screws
(A).
Make
sure:
• The power
cord is still firmly in the socket.
• The fiU tube (16) is still in the fill cup opening.
(Check
the rear of the refrigerator
to make sure
the fill tube has not been
pushed
out of the back
of the refrigerator.)
• The icemaker
mounting
screws are located
in
the uppermost
position
of the mounting
slots.
THEN TIGHTEN
THE ICEMAKER MOUNTING
SCREWS SECURELY.
1-_ INSTALL THE ICE BUCKET
Put the ice bucket (11) in
place
under
the icemaker.
Make sure the icemaker
power switch is set to O (off).
ATTACH WARRANTY
LABEL
A label (9) is provided
with this kit to record the
date of installation
for warranty
purposes.
Apply it
to the back of the refrigerator.
[]
KEEP THIS MANUAL
The warranty for the icemaker is printed
in this
manual. Keep this manual with your Refrigerator
Owner's Manual.
The icemaker installation
inside the freezer
is now
complete.
Continue
to the Water Valve Assembly
section.
23

Advertisement

loading