Installation Process Flow - Avaya G860 Installing And Operating

Media gateway
Hide thumbs Also See for G860:
Table of Contents

Advertisement

3

Installation Process Flow

The installation process flow depicted in the figure below illustrates the steps involved
in the installation process.
Customers should prepare the site according to the requirements described in the Site
Preparation section prior to the installation of the Avaya G860 Media Gateway
equipment. The Hardware Installation phase comprises:
Unpacking the equipment
Mounting the chassis on the rack
Connecting network, console, power and earthing cables
Powering up the system
Verifying that the system is in working order
Next is the Software Installation phase, which consists of:
Defining IP parameters
Configuring Sun™ Solaris™ OS
Installing and configuring the System Controller software
Connecting to external equipment
Installing the trunk cables.
The final installation phase consists of configuring the Element Management System
(EMS) or alternative MIB Browser.
Note:
The installation process includes installation of the system control software
on the SC boards only. All boards come with pre-installed firmware and
embedded software as appropriate. The SC boards come with a pre-
installed Sun™ Solaris™ operating system
3. Installation Process Flow
Issue 1 October 2007 43

Advertisement

Table of Contents
loading

Table of Contents