Axminster WS1000TA User Manual page 13

Trade series spindle moulder
Table of Contents

Advertisement

Fig 19
Fig 21
Lift & shift handle pin lock
Step 3
Spindle Guard Assembly
Locate the spindle guard (D1) and the two M8 x 140mm lift & shift handles with washers (D2). Raise the spindle
to the maximum height by unlocking the spindle moulder rise/fall locking handle (a) and turning the spindle
moulder rise/fall wheel clockwise (b) then lock in place (See figs 23-24).
Remove the circular rings from the work table and place aside, see fig 25, Lower the spindle guard (D1) onto the
work surface & line up the machined slots in the guard casting (D1) with the two pre-drilled holes on either side
of the spindle (See figs 24-26). Put to hand the lift & shift handles (D2), slide each one through the machined slot
in the guard casting (D1) and screw them into the pre-drilled holes on the spindle table, locking the guard (D1) in
position (See figs 27-28).
Fig 23
90˚ Stop
Pin
(a)
B2
B1
(b)
Turning the handle to
lock pin
(b)
Pre-drilled holes
Assembly
Fig 20
Fig 22
(a)
Turn butterfly knob to
lock the fence
Fig 24
13

Advertisement

Table of Contents
loading

Table of Contents