Setup and Operation
5. On initial start–up or after UV Reactor or Glass Liquid
Separator (GLS) servicing, fill the U-Tube with D. I.
water as indicated in Figure 4-2.
6. After all of the above checks, turn analyzer ON by
activating the facility power switch. The system starts up
in Run Mode.
7. Immerse line from "sample" port of the analyzer into D.
I. water container.
8. Immerse persulfate line from the "persulfate" port of the
analyzer into persulfate container.
9. Immerse acid line from the "ACID IN" port of the
analyzer into ACID container.
Teledyne Analytical Instruments
Figure4-1: Drain Connections
Model 6750
30