Inspection; "Ta Main Shift Rail/Shift Actuator Installation; "Ua Shift Rail Drive Gear Installation; "Wa Switch Installation - Mitsubishi V5A51 Manual

Automatic transmision
Hide thumbs Also See for V5A51:
Table of Contents

Advertisement

Mark
A
D
E
E
Mitsubishi Motors Corporation
V5A51 -
"TA MAIN SHIFT RAIL / SHIFT ACTUATOR
1. Apply grease to the O-ring.
2. Combine the main shift rail key with actuator key and

"UA SHIFT RAIL DRIVE GEAR INSTALLATION

Install the shift rail drive gear with its marked tooth in mesh
with the third gear groove of each shift rail.
Third gear
"VA TRANSFER CASE COVER INSTALLATION
Apply sealant to the illustrated position of the transfer case
cover.
Specified sealant:
Caution
D

"WA SWITCH INSTALLATION

B
Install the switches in the right positions.
C
A
B
C
D
E

INSPECTION

SWITCHES
Check for the continuity between the connector terminal and
switch body. Replace the switch if found faulty.
Switch state
Switch end pressed
Switch end released
Mar. 2000
Transfer
INSTALLATION
Specified grease:
MITSUBISHI genuine grease part No. 0101011 or
equivalent
insert them in the transfer case.
MITSUBISHI genuine sealant part No. MD997740 or
equivalent
Squeeze the sealant out evenly to make sure that
it is not broken or excessively supplied.
Tube color
Switch name
4LLC switch
Black
2WD switch
Black
Center differential
Blue
lock switch
4H switch
Blue
2-4WD switch
Blue
PWEE8920-I
23E-15-11
Connector color
Brown
Black
Brown
White
Black
Continuity
No
Yes
Added

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents