Installing The Second Power Supply Module (Ac Or Dc) - Nortel CALLPILOT Installation And Configuration Manual

Part 2: 1001rp server hardware installation
Hide thumbs Also See for CALLPILOT:
Table of Contents

Advertisement

Power supply installation
Installing the second power supply
module (AC or DC)
Introduction
One power supply module is shipped installed. The second power supply
module is shipped uninstalled and must be installed as part of the CallPilot
installation.
AC versus DC systems
The power supply modules are similar in appearance for both AC and DC
1001rp servers. The procedures in this section apply to both AC and DC
1001rp servers.
About the power supply module
After the server is powered up (later in this guide), the power supply module
LED indicates its status.
A green LED indicates that the power supply module is working properly. If
the LED on the power supply module is unlit or red, the module is failing or
has failed. Other indicators are an alarm sounding and the power supply
LED on the status display on the front of the server turning red.
40
Standard 1.0
CallPilot

Advertisement

Table of Contents
loading

This manual is also suitable for:

Callpilot 1001rp

Table of Contents