Nortel CALLPILOT Installation And Configuration Manual page 36

Part 2: 1001rp server hardware installation
Hide thumbs Also See for CALLPILOT:
Table of Contents

Advertisement

Preparing for installation
IF
you are satisfied that the
1001rp server has arrived
at your site undamaged
36
THEN
replace the server cover and
proceed with the hardware
installation.
See "Installation checklist" on page
26.
Note: Do not reinstall the front
bezel until the server is in its final
location and the CallPilot
installation is complete.
Standard 1.0
CallPilot

Advertisement

Table of Contents
loading

This manual is also suitable for:

Callpilot 1001rp

Table of Contents