Lucent Technologies PARTNER Advanced Communications System Release 1.0 Installation Manual page 33

Hide thumbs Also See for PARTNER Advanced Communications System Release 1.0:
Table of Contents

Advertisement

5
A)
Slide the top module to the left to disengage its
interlocking mounting tracks from the
PARTNER ACS processor module.
B)
If you are replacing the PARTNER ACS
processor module, skip to Step 7. If you are
replacing the top module, continue with Step 6.
6
Mount the new module by following Steps 3 through 8
in "Wall-Mounting a 2-Slot Carrier and Modules,"
earlier in this giude, and then skip to Step 8 below.
7
A)
Remove the screw at the top of the PARTNER
ACS processor module and remove the
module from the wall.
B)
Mount the new PARTNER ACS processor
module by following the instructions in
"Wall-Mounting a Stand-Alone PARTNER ACS
Processor Module" and "Inserting Batteries in
the PARTNER ACS Processor Module," earlier
in this guide.
C)
Remount the top module by following Steps 1
and 3 through 8 in "Wall-Mounting a 2-Slot
Carrier and Modules" earlier in this guide.
8
Connect the line and extension cords one at a
time, making sure to place the correct cords into
their corresponding jacks on the new module.
(See "Connecting Lines and Extensions" earlier in
this guide.)
9
Reconnect the power cord.
Mounting
Tracks
Equipment Upgrades
29

Advertisement

Table of Contents
loading

Table of Contents