Wall-Mounting a 5-Slot Carrier and Modules

Install the 5-Slot carrier within 5 feet (1.5 meters) of a properly grounded wall outlet (not controlled by a
switch) and the network interface jacks. In addition, when you mount the carrier on the wall, leave at
least 1 foot (0.3 meter) of clearance at the top and sides, and 2 feet (0.6 meter) at the front and bottom
to ensure proper ventilation.
NOTE:
The location of each module within the carrier is important; place them as instructed in the
following procedure.
1
A)
Hold the 5-Slot carrier against the wall.
B)
Using the four screw keyholes in the carrier as a
template, mark screw locations on the wall.
C)
Start four #12 screws, leaving the screw heads
extending approximately 1/4" (.64 cm) from
the wall.
D)
Slip the carrier onto the screws, then
tighten them. Do not overtighten them—the
carrier will warp.
2
Before installing any modules, make sure the clear,
plastic protector has been removed from the
connector area on the rear of each module. To
remove the protector, grasp the tabs on the ends
of the protector and lift.
3
A)
Slide the PARTNER ACS processor module
into the center slot of the carrier .
B)
Align the module carefully. Then push slowly
but firmly in the center of the module until the
connectors on the module lock into place, and
the module is attached to the rear of the
carrier. Do not force the module. If it does not
insert easily, remove the module, clear any
obstruction, and reinsert it.
"
1
4
4 c
( . 6
Tab
Tab
Installation Procedures
m )
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PARTNER Advanced Communications System Release 1.0 and is the answer not in the manual?

Questions and answers

Table of Contents