Powering Up the System
NOTE:
If you plan to use the Backup and Restore features of the system, insert a Backup/Restore PC
Card, which must be purcased separately, in PC Card Slot 2 before applying power to the system
and leave the PC Card in place until you are ready to use it. The system must be powered down
before inserting or removing a PC Card from the PC Card slot. See "Inserting a PC Card" later in
this guide.
1
A)
If you have a Stand-Alone or a 2-Slot carrier
configuration, skip to Step 1B. If you have a
5-Slot carrier, move the carrier's On/Off
switch to the "Off" position ("O").
B)
Press the power cord firmly into the power jack
on the carrier or Stand-Alone PARTNER ACS
processor module until it locks into place.
(See the illustrations on this page for the
location of the power jack for each type of
configuration.)
C)
Plug the other end of the power cord into a
properly grounded three-prong wall outlet not
controlled by a switch.
D)
If you have a 5-Slot carrier, power up the control
unit by moving the On/Off switch to the "On"
position ("l").
14
Installation Procedures
5-Slot Carrier
On/Off Switch
PFT
L
I
N
PFT
E
L
S
I
N
E
S
PFT
L
I
N
PFT
E
L
S
I
206
N
MODULE
E
R3.0
S
PFT
206
MODULE
R3.0
PFT
E
X
T
400
E
E
MODULE
X
R3.0
N
T
S
PFT
400
E
MODULE
I
R3.0
O
N
N
S
PFT
E
S
I
X
O
T
N
E
E
S
N
X
S
T
I
E
N
O
S
N
I
S
O
N
S
2-Slot Carrier
Stand-Alone
PARTNER ACS
Processor Module
Power
Jack
Need help?
Do you have a question about the PARTNER Advanced Communications System Release 1.0 and is the answer not in the manual?
Questions and answers