Lucent Technologies PARTNER Advanced Communications System Release 1.0 Installation Manual page 32

Hide thumbs Also See for PARTNER Advanced Communications System Release 1.0:
Table of Contents

Advertisement

Replacing Modules in a 2-Slot Carrier
WARNING:
Before starting, verify that you have charged batteries installed in the PARTNER ACS
processor module, and then disconnect the power cord from the power jack on the carrier.
For an illustration showing the location of the power jack, see "Powering Up the System"
earlier in this guide.
1
Check the slack in the wires. If there is not enough
slack to remove the modules without pulling the
line and extension cords free, label and disconnect
the wires before continuing.
2
Remove the long screw at the bottom of the modules.
3
Remove the screws that attach the carrier to the
modules.
4
Pull the carrier to the right to remove it.
28
Equipment Upgrades
PARTNER
2 0 6
E
D U L
M O

Advertisement

Table of Contents
loading

Table of Contents