Liability & Warranty
UL Hardware Preparation
Prepare the hardware as follows ensuring that the relevant manufacturer's
installation instructions are complied with. If you have doubts about any of
these, call your supplier.
1.
This apparatus must be professionally installed.
2.
Select a "CE" computer chassis according to the Safety Requirements
above, ensuring that it has an external marked earth point.
3.
The host machine ISA bus pins B1, B10 or B13 MUST be tested to
ensure that there is less than 0.1 Ohms to the earthing terminal.
4.
The host machine PCI bus pins complies with PCI Board
specifications Rev. 2.1 (5V 32-bit).
5.
Prepare the chassis, in accordance with the PC manufacturers
instructions, to receive the necessary PC cards, ensuring the
installation of extension cards does not result in non-conformance to
the Safety Requirements above.
6.
When installing a system using AltiGen's cards, note that the
continued compliance to the LVD and EMC EU Directives at the
system level is the responsibility of the system supplier.
7.
Prepare above cards ensuring all jumpers are set according to the
manufacturer's instructions.
8.
Attach suitable grounded ESD wrist strap between wrist and earth.
9.
Follow the manufacturer's instruction and install above cards into PC.
10. Note: If more than three cards are using the MVIP, ensure that the
Quantum or Triton board set as board zero is installed at one end of the
MVIP cable and the board at the far end of the MVIP cable has its
switch set to terminated (switch closed).
11. Replace PC outer case.
12. Connect a fixed earth from the PC to a suitable premises fixed earthing
point. Note that the earth cable must be at least the same gauge as the
live wire of the main cord and fixed to the earth terminal and the rear
of the PC. (6 AWG recommended, 8 AWG minimum.)
13. Connect cable supplied with AltiServ to the "D-type sub-miniature"
(25 pin) connector on the AltiServ card and the connector to the
Modular RJ-11 Patch Panel.
14. Connect the building telecommunication wiring to the RJ-11 sockets.
15. Building telecommunication wiring should be installed according to
the National Wiring Regulations for Telecommunications.
xviii AltiWare OE 4.0 Getting Started Manual
Need help?
Do you have a question about the AltiWare OE Release 4.0 and is the answer not in the manual?