Step 4: Install Mass Storage Cage - HP D5970A - NetServer - LCII Manual

Mass storage upgrade kit guide
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 2

Step 4: Install Mass Storage Cage

1.
Orient the hot-swap mass storage cage, as shown in Figure 2-11. The
backplane of the cage faces into the empty expansion bay. The connectors
on the cage's backplane are near the edge closest to the CD-ROM drive.
CD-ROM Drive
Management Board
Pedestal Configuration
Figure 2-11. Orient and Insert the Hot-Swap Mass Storage Cage
(Shown for HP NetServer LH 3 and LH 3r)
CD-ROM Drive
Management
Board
Secondary Hot-Swap
Mass Storage Cage
with 5 Filler Panels
Secondary Hot-Swap
Mass Storage Cage
with 5 Filler Panels
Rack-Optimized Configuration
Installation
19

Advertisement

Table of Contents
loading

Table of Contents