2 Installation
Installation Overview
Installing a second hot-swap mass storage cage in your NetServer requires these
general steps, which are described in this chapter:
Step 1: Power Down and Disconnect
Step 2: Remove Front Bezel
(If the NetServer is in a rack enclosure, remove it.)
Step 3: Remove Cover 1 and Cover Plate
Step 4: Install Mass Storage Cage
Step 5: Remove Fan Assemblies
Step 6: Install SCSI Cable
Step 7: Connect Power Harness
Step 8: Replace Fan Assemblies
Step 9: Replace Cover 1 and Front Bezel
(Also replace the NetServer in the rack, if necessary.)
Step 10: Install Hard Disk Drive Modules
Step 11: Reconnect Power Cord(s) and Other Cables
Step 12: Verify Hard Disk Drive LEDs
After you finish the installation, go to Chapter 3 to configure your mass storage.
Step 1: Power Down and Disconnect
Do the following to power down and disconnect the NetServer:
1. Back up your system.
2. Bring down the network properly.
7