Base Door Removal; Base Door Installation - eMachines E644G Service Manual

Emachines e644 and e644g series serivce guide
Table of Contents

Advertisement

Base Door Removal

Prerequisite:
Battery Pack Removal
1. Locate base door (B) on lower cover. (Figure 3-9)
2. Remove two (2) screws (A). (Figure 3-9)
3. Remove door from lower cover.
B
C
Figure 3-9. Base Door

Base Door Installation

1. Insert door flanges into slots (B) on lower cover. (Figure 3-9)
2. Secure door to lower cover with two (2) screws (A). (Figure 3-9)
3. Install battery pack.
3-14
0
A
Machine Maintenance Procedures
0

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E644G and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

E644

Table of Contents