Back Up Hafm Configuration Data; Configure Open Systems Management Appliance; Configure Feature Key; Configure Open Trunking - HP 316095-B21 - StorageWorks Edge Switch 2/24 Installation Manual

Fw v06.xx/hafm sw v08.02.00 hp storageworks edge switch 2/24 installation guide (aa-rtdwc-te, july 2004)
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Installing and Configuring the Edge Switch 2/24
5. Choose Enable Call Home Event Notification to perform applicable tests.
6. Click Send Test. Call-home and e-mail test messages are transmitted. Click
7. Maximize the Hardware View.
8. At the Hardware View, select Enable Call Home Notification from the

Back Up HAFM Configuration Data

It is important to back up the HAFM configuration data. This data is used to
restore the HAFM appliance See the HP StorageWorks Edge Switch 2/24 Service
Manual for instructions on backing up the HAFM configuration data.
Once the HAFM configuration data is backed up, go to
Channel

Configure Open Systems Management Appliance

For complete procedures on configuring this optional feature, refer to HP
StorageWorks Edge Switch 2/24 Element Manager User Guide.

Configure Feature Key

For complete procedures on configuring this feature, refer to HP StorageWorks
Edge Switch 2/24 Element Manager User Guide.

Configure Open Trunking

This option is only available if the optional Open Trunking feature is installed.
Choosing this option opens the Configure Open Trunking dialog box. For details
on enabling Open Trunking and configuring such parameters as congestion
thresholds for ports, event notification options, and low BB credit threshold, refer
to HP StorageWorks Edge Switch 2/24 Element Manager User Guide.
88
The call home test provides a test notification message to a remote support
center. Depending on the option chosen during HAFM installation, the test
notification message is transmitted over telephone lines or LAN.
OK to close the dialog box.
Maintenance menu. A check mark displays a check box to indicate call-home
event notification for the switch is enabled, and the menu closes.
Ports" on page 89.
"Connect Cables to Fibre
Edge Switch 2/24 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents