Unpack And Inspect The Switch - HP 316095-B21 - StorageWorks Edge Switch 2/24 Installation Manual

Fw v06.xx/hafm sw v08.02.00 hp storageworks edge switch 2/24 installation guide (aa-rtdwc-te, july 2004)
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Installing and Configuring the Edge Switch 2/24

Unpack and Inspect the Switch

This section provides instructions for unpacking and inspecting the Edge
Switch 2/24 prior to installing it in a desktop or rack-mount configuration.
To unpack and inspect the switch:
1. Inspect the shipping containers for damage caused during transit. If a
2. Unpack the shipping containers and inspect each item for damage. Save all
3. If any items are damaged or missing, customers should contact an
50
Caution:
When you remove the Edge Switch from the carton, do not rest it on
its rear window while examining it. To do so may break the FRU handles.
container is damaged, ensure that a representative from the freight carrier is
present when the container is opened.
shipping and packing materials. Ensure that all items on the enclosed shipping
list are in each container.
HP-authorized service provider or reseller.
Edge Switch 2/24 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents