Installing and Configuring the Edge Switch 2/24
7. After successful POST completion, the green power (PWR) LED remains
8. If a POST error or other malfunction occurs, refer to the HP StorageWorks
9. Perform the following steps:
52
d. The green/blue and amber LEDs associated with Fibre Channel ports
blink momentarily while the ports are tested.
ON and all other front panel LEDs turn OFF.
Edge Switch 2/24 Service Manual to isolate the problem.
If you manage the switch through EWS, go to
Server" on page 95 to configure the switch.
If you manage the switch through HAFM, go to
Network
Information" on page 53.
"Using the Embedded Web
"Configure Switch
Edge Switch 2/24 Installation Guide