Booting The Switch; Checking Before Powering On The Switch; Powering On The Switch - H3C LS-5500-28C-PWR-SI-OVS Installation Manual

S5500-si complete series
Table of Contents

Advertisement

Installation Manual
H3C S5500-SI Complete Series Ethernet Switches

4.4 Booting the Switch

4.4.1 Checking before Powering on the Switch

Before powering on the switch, verify that:
The power cord and ground wire are properly connected.
The power supply voltage is consistent with that required by the switch.
The Console cable is properly connected; the terminal (which can be a PC) used
for configuration has been started; and the configuration parameters have been
set.

4.4.2 Powering on the Switch

All the S5500-SI series Ethernet switches have the same Boot ROM display style. This
document uses the Boot ROM display of S5500-28C-SI as an example:
Starting......
Press Ctrl-B to enter Boot Menu... 0
The last line asks whether you want to enter the Boot Menu. The system waits two
seconds for your response.
***********************************************************
*
*
H3C S5500-SI BOOTROM, Version 117
*
***********************************************************
Copyright (c) 2004-2007 Hangzhou H3C Technologies Co.,Ltd.
Creation date
: Apr 15 2007, 20:31:56
CPU Clock Speed : 264MHz
BUS Clock Speed : 33MHz
Memory Size
: 128MB
Mac Address
: 000fe2005502
4-5
Chapter 4 Powering on the Switch for the First Time
*
*
*

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents