Booting The Switch; Checking Before Power-On; Powering On The Switch - H3C S5120-SI Series Installation Manual

Hide thumbs Also See for S5120-SI Series:
Table of Contents

Advertisement

Step5 Click Properties in the HyperTerminal window to enter the Switch Properties dialog box. Click the
Settings tab, set the emulation to VT100, and then click OK.
Figure 4-7 Set terminal emulation in Switch Properties dialog box

Booting the Switch

Checking Before Power-On

Before powering on the switch, verify that:
The power cable is properly connected.
The power supply voltage meets the requirement of the switch.
The console cable is properly connected; the terminal or PC used for configuration has been
started; and the configuration parameters have been set.

Powering On the Switch

The S5120-SI series have the same Boot ROM display style. This document uses the Boot ROM output
information on the S5120-28P-SI as an example:
Starting......
************************************************************************
*
*
*
************************************************************************
Creation Date
CPU Type
H3C S5120-28P-SI BOOTROM, Version 107
: Feb 11 2009
: ARM926
4-5
*
*
*

Advertisement

Table of Contents
loading