Step5 Click Properties in the HyperTerminal window to enter the Switch Properties dialog box. Click the
Settings tab, set the emulation to VT100, and then click OK.
Figure 4-7 Set terminal emulation in Switch Properties dialog box
Booting the Switch
Checking Before Power-On
Before powering on the switch, verify that:
The power cable is properly connected.
The power supply voltage meets the requirement of the switch.
The console cable is properly connected; the terminal or PC used for configuration has been
started; and the configuration parameters have been set.
Powering On the Switch
The S5120-SI series have the same Boot ROM display style. This document uses the Boot ROM output
information on the S5120-28P-SI as an example:
Starting......
************************************************************************
*
*
*
************************************************************************
Creation Date
CPU Type
H3C S5120-28P-SI BOOTROM, Version 107
: Feb 11 2009
: ARM926
4-5
*
*
*