Download Print this page

Ebl512 G3; Ebl128; Ebl512; Checklist - Panasonic WEB-SERVER II Technical Description

Hide thumbs Also See for WEB-SERVER II:

Advertisement

13. INSTALLATION AND WIRING

13.1. EBL512 G3

24 VDC cable
a) Plug the cable in the web-server power supply header.
b) Remove the other cable plug.
c) Connect the brown wire to the screw terminal J3:1 and the blue wire to the screw terminal J3:2.
d) Connect the green wire to the screw terminal J2:3 (earth).
RS 232 cable
e) Connect the black wire to the web-server screw terminal PLC COM:G (GND), the green wire to R
(TxD) and the yellow wire to S (RxD).
f) Plug the cable in the main board header J7.

13.2. EBL128

24 V DC cable
a) Plug the cable in the web-server power supply header and in the main board header J4.
RS 232 cable
b) Connect the black wire to the web-server screw terminal PLC COM:G (GND) and the yellow wire to
S (RxD).
c) Plug the cable in the main board header J5.

13.3. EBL512

24 V DC cable
a) Connect the 24V DC cable between the web-server and a power supply. Use the crimp terminal for
optimal connection of the earth wire.
RS 232 cable
b) Mount the two screwlocks on the RS-232 connector in the EBL512 c.i.e.
c) Insert the end of the cable in the gap between the cabinet and the inner door. Fix the cable with the
cable ties and the cable tie mounting base.
d) Connect the black wire to the web-server screw terminal PLC COM:G (GND), the green wire to R
(TxD) and the yellow wire to S (RxD).

13.4. CHECKLIST

• Are the connectors firmly connected
• Are the connectors properly connected with respect to their voltage and polarity
• Are the cables securely fixed
TECHNICAL DESCRIPTION 1598 • DOCUMENT NUMBER: MEW01930 • REVISION: 4
52

Advertisement

loading
Need help?

Need help?

Do you have a question about the WEB-SERVER II and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Fp-web2