11. REMOTE OPERATIONS
11.4. MAINTENANCE OPERATIONS
Press the Maintenance operations button to access a list of different maintenance operations.
A press on the Select button on each item will open a pop-up window with corresponding maintenance
operation.
11.4.1. SET CALENDAR TIME
The date and time for the web-server and the EBL system can be set in the pop-up dialog box. Press Apply
to set the date and time currently shown in the dialog box or press Cancel for no change.
11.4.2. SYNCHRONIZE
This operation starts a synchronization of the EBL-system, which includes EBL CU, EBLWin, and EBLWeb.
The synchronization status of each c.i.e. is shown in the c.i.e. list, see section
.
10.8. CONTROL UNIT
11.4.3. SILENCE ALARM DEVICES
This operation works like the silence alarm devices button on the c.i.e front.
NOTE! Silence alarm devices cannot be activated if there is no fire alarm in the system.
11.4.4. EVACUATE
This operation activates / de-activates the evacuate function.
11.4.5. CALIBRATE OUTPUTS
This operation activates / de-activates the EBL-system for sensitive fault detection mode.
11.4.6. CLOSE FIRE DOOR
This operation will collectively close all fire doors, that is programmable outputs with a control expression
containing one or more trigger conditions Fire Door Closing (zone – address), in all c.i.e. or in a specified
c.i.e. (00-29).
48
TECHNICAL DESCRIPTION 1598 • DOCUMENT NUMBER: MEW01930 • REVISION: 4
Need help?
Do you have a question about the WEB-SERVER II and is the answer not in the manual?
Questions and answers