Download Print this page

Endless Pools FASTLANE PRO Owner's Manual page 24

Hide thumbs Also See for FASTLANE PRO:

Advertisement

Fastlane
Pro Swim Unit Installation
®
The threaded rods must be tied into the pools bonding grid. If using rebar in the pools concrete collar,
W
tie the threaded rods to the rebar using rebar wire. Secure a bonding clamp to each threaded rod. Attach
a #8 solid copper wire to each bonding clamp. These wires MUST be attached to a bonding connection
that's incorporated into the pools bonding grid. In most cases this connection will be at the pools existing
equipment (heater, pump, etc.) that's presumably already tied into the bonding grid of the pool. Verify these
connections are tight before pouring concrete (Fig 4.29).
Fig. 4.29
Prior to pouring concrete, it is critical that the opening of each thru-wall and the threaded rods that extend
into the finished pool be covered. No concrete can be embedded in these areas.
When all of the connections on the outside of the pool are complete, a concrete collar should be poured
around the threaded rods and conduit. This encasement will help secure the Fastlane Pro (Fig 4.30)
Fig. 4.30
23
Bonding Clamp
Threaded
Rod
DETAIL A
Bonding Clamp
(See Detail A)
#8 Solid
Copper
Wire

Advertisement

loading
Need help?

Need help?

Do you have a question about the FASTLANE PRO and is the answer not in the manual?

Questions and answers