Parts Included In The Delivery; Required Parts For Installation - ABB HVC 200 Operation And Installation Manual

Table of Contents

Advertisement

AGC code
ABB6AGC116223
ABB6AGC116225
ABB6AGC116224
12.2

Parts included in the delivery

Part
Power cabinet
Key to the power cabinet door
Key to the DC door
12.3

Required parts for installation

Part
Fasteners and washers, to connect the
charge post to the foundation
Fasteners and washers, to connect the
power cabinet to the foundation
Fasteners and washers, for the earthing
connections
Table 2: Cable lugs
Location Wire
Power
cabinet
HVC 200/300/360-EN | 002
Short description
200-2D UL
200-4S UL
200-2S UL
Note: It is possible that more parts need to be included in the delivery.
Refer to the order.
Size
PE
M12
M10
M6
AC input power
M12
DC power
M12
Description
HVC UL 200-2 M-PD-0
HVC UL 200-4 M-P-0
HVC UL 200-2 M-P-0
Specification
Refer to the type plate. Refer to section 3.1.
Unique for each power cabinet
Unique for the DC door
Specification
M12, class A2, length 70 mm (2.75 in)
M16, class A2, length 70 mm (2.75 in)
M10, class A2, length 70 mm (2.75 in)
Maximum width
[mm]
[in]
35
1.4
25
70
12
0.5
39
1.5
39
1.5
Technical data
Maximum length
[mm]
[in]
70
2.7
50
70
40
1.6
70
2.7
70
2.7
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hvc 300Hvc 360

Table of Contents