Sign In
Upload
Manuals
Brands
ABB Manuals
Industrial Equipment
HVC 360
ABB HVC 360 Manuals
Manuals and User Guides for ABB HVC 360. We have
2
ABB HVC 360 manuals available for free PDF download: Operation And Installation Manual
ABB HVC 360 Operation And Installation Manual (92 pages)
Brand:
ABB
| Category:
Industrial Equipment
| Size: 7 MB
Table of Contents
Table of Contents
3
1 About this Document
8
Function of this Document
8
Target Group
8
Revision History
8
Language
8
Illustrations
8
Units of Measurement
9
Typographical Conventions
9
How to Use this Document
9
General Symbols and Signal Words
9
Special Symbols for Warnings and Dangers
10
Manufacturer and Contact Data
11
Abbreviations
11
Terminology
12
Orientation Agreements
13
2 Safety
14
Liability
14
General Safety Instructions
14
Responsibilities for the Owner
15
Required Qualifications for the Qualified Installation Engineer
15
Personal Protective Equipment
16
Safety Instructions During Transport
16
Safety Instructions During Installation
16
Safety Instructions for Use
17
Safety Instructions During Cleaning or Maintenance
17
Safety Instructions for Earthing
17
Signs on the EVSE
18
Discard the EVSE or Parts of the EVSE
18
Cyber Security
19
FCC Compliance Statement
19
3 Description
20
Type Plate
20
Intended Use
20
Overview
21
System Overview
21
Power Cabinet, Outside
22
Power Cabinet, Inside
23
AC Plate
24
DC Plate
25
Cable Glands in the Power Cabinet
26
Control Elements
27
LED Indicators
27
Power Allocation Strategies
28
Static Allocation
28
Dynamic Allocation
28
Options
29
Emergency Stop Button (EMO)
29
4 Transport, Handling and Unpacking
31
Transport the EVSE to the Site
31
Hoist the Packaged Cabinet
31
Move the Packaged Cabinet with a Forklift Truck
32
Unpacking
33
Unpacking Procedure
33
Do a Check of the Transport Sensors
33
5 Pre-Installation
35
Prepare the Site
35
Control the Space and Airflow Around the EVSE
36
Install the Cable Ducts
36
Prepare the Foundation
36
Prepare a Foundation - General Procedure
36
Prepare the Foundation for the Power Cabinet (Concrete)
37
Prepare a Metal Foundation for the Power Cabinet
37
Install the Cable Gland Plate for the Concrete Foundation of the Power Cabinet
38
6 Installation
39
Install the Power Cabinet - General Procedure
39
Mechanical Installation
39
Mechanical Installation of the Power Cabinet - General Procedure
39
Install the Cabinet on the Foundation
39
Install the Cover Plates of the Metal Foundation
40
Electrical Installation
41
Electrical Installation of the Power Cabinet - General Procedure
41
Connect the PE Wire of the AC Input Cable
42
Connect the AC Input Wires
42
Connect the AC Auxiliary Power Cable (3 Phase 480 V) in the Power Cabinet
43
Connect the AC Auxiliary Power Cable (1 Phase 120 V) in the Power Cabinet
45
Connect the DC Power Cables
46
Connect the DC Auxiliary Power Cables (24 V) to the Power Cabinet
47
Connect the Interlock and DC Guard Cables to the Power Cabinet
48
Connect the Ethernet Output Cables to the Power Cabinet
51
Connect the Optical Fiber Cables (Ethernet to Fiber)
52
Connect the Optical Fiber Cables (CAN to Fiber)
52
Installation Procedure for the the Long Distance Kit (Optional)
53
Disconnect the Ethernet Cable from the Converter
53
Connect the Ethernet Cable to the Connector
54
Connect the EMO Cable to the Power Cabinet (Optional)
55
Install a Ferrule on a Wire
56
Connect a Wire that Has a Ferrule
57
Precommissioning Mode
57
General Information
57
Precommissioning Mode - General Procedure
58
Do an Inspection of the PE Connection
59
Connect the 120 V Cable for the Precommissioning Mode
59
Do a Check on the Electrical Parts
60
Set the Precommissioning Switch
60
7 Commissioning
61
Precommissioning Mode
61
Do a Check on the Status of the Precommisioning Mode
61
General Procedure
61
Set the Precommissioning Switch
61
Remove the 120 V Cable for the Precommissioning Mode
62
Prepare for Commissioning
62
8 Operation
64
Prepare before Use
64
Emergency Stop
64
Reset the EVSE after an Emergency Stop
64
Charge Session
65
Charge an EV
65
Start a Charge Session
65
Stop a Charge Session
65
9 Maintenance and Cleaning
66
Maintenance Schedule
66
Do a Check on the Cabinet
66
Clean the EVSE
66
10 Access to Parts
68
Open the Door of the Power Cabinet
68
Close the Door of the Power Cabinet
68
Remove the Plinth Covers of the Power Cabinet
69
Install the Covers
69
Remove the AC Cover
70
Install the AC Cover
70
Open the DC Door
71
Close the DC Door
71
11 Troubleshooting
73
Troubleshooting Procedure
73
12 Technical Data
74
Types of EVSE
74
EVSE Type
74
HVC Variants
74
Parts Included in the Delivery
75
Required Parts for Installation
75
Torque Specifications
76
General Specifications
76
Cleaning Specifications
76
Dimensions and Mass
77
Cable Slack
78
Space Requirements
79
Foundation Specifications
80
Power Cabinet (Custom Foundation)
80
Power Cabinet (Metal Frame)
81
Ambient Conditions
81
Wiring Diagram for the Optical Fiber Cables
82
Cable Specifications
82
General Specifications for Cables
82
AC Input Cables
83
AC Auxiliary Power Cable (3 Phase 480 V AC)
83
AC Auxiliary Power Cable (1 Phase 120 V)
83
DC Power Cables
84
DC Auxiliary Power Cables
84
PE Cables
85
Interlock Cables
85
Interlock + DC Guard Cable
86
Ethernet Cables
86
Optical Fiber Cables
86
AC Input Specifications
87
200 Kw Configuration
87
DC Output Specifications
88
Power Curve
89
Protection for the AC Auxiliary
90
Power Consumption Specifications
90
Terminal Part Numbers
90
Advertisement
ABB HVC 360 Operation And Installation Manual (107 pages)
PU Control Box depot (CE version) for multi-outlet cabinet
Brand:
ABB
| Category:
Industrial Equipment
| Size: 32 MB
Table of Contents
Table of Contents
3
Introduction and General Information
5
Disclaimer and Warranty Conditions
5
Function and Target of this Document
5
Language
6
How to Use this Document
6
Abbreviations
6
Terminology
7
Document Revision History
8
Safety
9
Liability
10
Responsibilities and Qualifications for the Users
10
Intended Use
11
Risks Related to Improper Use or Product Defect
11
Residual Risks
12
General Signs and Signal Words
12
Symbol Description
12
Personal Protective Equipment
14
Safety Instructions
14
Safety Instructions During Transport
14
Safety Instructions During Installation
15
Safety Instructions During Cleaning or Maintenance
15
Safety Instructions During the Use
15
Discard the EVSE or Parts of the EVSE
16
Cyber Security
16
Conformity
16
Description
18
Orientation Agreements
18
Orientation Agreement
18
Type Plate - Identification of Equipment
19
EVSE Identification Code
19
System Overview
20
Overview
21
Overview of the System
21
PU Control Box Depot - Overview
22
Overview - Outside
22
Overview - Inside
23
Overview - Cable Glands
25
Overview - Contact Dome
26
EVSE Status Beacon
27
Authorization to Charge
27
Working Principles
28
Optionals
29
External LED Tower Lights
29
External Emergency Stop Button
30
External Charge Stop Button
30
Long Distance Communication Kit
31
Power Supply Box
32
Transport, Handling and Unpacking
34
Transport of the EVSE - Preliminary Operation
35
Move the EVSE with a Forklift Truck
36
Unpacking
36
Unpacking Procedure
36
Components Supplied with the EVSE
37
Access to the Internal Parts
38
Access to the Internal Parts - PU Control Box Depot
39
Open the Lock of the Door - PU Control Box Depot
39
Open/Remove the Internal Covers - PU Control Box Depot
39
Close the Doors - PU Control Box Depot
40
Access to the Internal Parts - Power Supply Box (Optional)
41
Open the Lock of the Door - Power Supply Box
41
Close the Doors - Power Supply Box
41
Installation
42
Wall/Structure Installation of the Control Box
43
Wall Space Requirements
43
Top View
43
Parameter Description
43
Install the Brackets on the Control Box
44
Install the Control Box on the Wall/Structure
44
Ceiling Installation of the Contact Dome
46
Wall/Structure Installation of the Power Supply Box (Optional)
48
Wall Space Requirements
48
Font View
48
Install the Brackets on the Power Supply Box
49
Install the Power Supply Box on the Wall/Structure
49
Electrical Connection
51
Electrical Installation of PU Control Box Depot
52
Protective Earth (PE) Connection
52
DC Auxiliary Connection
54
DC Input Power Connection
55
Interlock and DC Guard Connection
57
Ethernet Connection
59
PE Connection (to the Contact Dome)
61
Control Pilot (CP) Connection (to the Contact Dome)
63
DC Output Power Connection (to the Contact Dome)
65
Power Supply Feedback Connection (Optional)
67
Electrical Installation of Contact Dome
69
Control Pilot (CP) and PE Connection
69
Connect the DC Power Cables to the Contact Dome
70
External Stop Button, Emergency Button and LED Tower Lights Connection (Optional)
71
Installation of Long Distance Kit (Optional)
73
Long Distance Kit Composition
73
Optic Fiber Cable (Not Supplied)
73
Install the Long Distance Kit
74
Electrical Installation of Power Supply Box (Optional)
78
Connect the Protective Earth (PE)
78
AC Auxiliary Connection
80
DC Output Auxiliary Connection
82
Power Supply Feedback Connection
84
Operation and Correct Use
86
Prepare for Commissioning
87
Prepare before Use
87
Charge Session
88
Start a Charge Session
88
Stop a Charge Session
89
Emergency Stop of a Charge Session (Optional)
89
Maintenance and Troubleshooting
90
Maintenance Schedule for the Owner
91
Troubleshooting
91
Technical Data
92
Technical Specification - PU Control Box Depot
93
Technical Data - PU Control Box Depot
93
Cable Glands - PU Control Box Depot
94
Cable Specifications- PU Control Box Depot
95
Torque Specification - PU Control Box Depot
96
Charging Interface - PU Control Box Depot
96
Technical Specification - Contact Dome
97
Technical Data - Contact Dome
97
Technical Specification - Power Supply Box (Optional)
98
Technical Data - Power Supply Box (Optional)
98
Power Supply Box Cable Glands
98
Cable Specifications - Power Supply Box (Optional)
99
Torque Specification - Power Supply Box (Optional)
99
Attachments
100
Overall Dimensions
101
PU Control Box Depot
101
Contact Dome
102
Power Supply Box (Optional)
103
External LED Tower Lights
104
Connection Diagram
105
Advertisement
Related Products
ABB HVC-C 100-150 kW
ABB HVC-PU 150 Overnight
ABB HVC-PU 100 Overnight
ABB HVC 200
ABB HVC 300
ABB HVL 120-0.3
ABB HT600314
ABB HT563856
ABB HT570026
ABB HT609436
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL