Figure 58: Verifying The At-Sbxpwrpoe1 Ac Power Supply; Figure 59: Raising The Handle On The At-Sbxpwrpoe1 Ac Power Supply - Allied Telesis SwitchBlade x3112 Installation Manual

Access edge chassis switch
Table of Contents

Advertisement

Chapter 4: Installing the Power Supplies
104
Figure 58. Verifying the AT-SBxPWRPOE1 AC Power Supply
5. Raise the locking handle on the AT-SBxPWRPOE1 AC Power Supply,
as shown Figure 59.
Figure 59. Raising the Handle on the AT-SBxPWRPOE1 AC Power
6. Align and insert the AT-SBxPWRPOE1 Module into slot A or B. See
Figure 60 on page 105.
Caution
The AT-SBxPWRPOE1 AC Power Supply will not work in slot C or
D.
Download from Www.Somanuals.com. All Manuals Search And Download.
Supply

Advertisement

Table of Contents
loading

Table of Contents