Power-On Process; Power-Off Process - LACO Technologies ATLAS Operation And Maintenance Manual

Leak test controller
Table of Contents

Advertisement

LACO Technologies
Installation).
Ensure that controller will be operating in an environment free of tracer gas.
Check the electrical network is properly attached to the connector using the
power cable.
Connect the necessary accessories or equipment before powering on the
device.
Verify proper operation voltage per the product label and switch on the device with
the power entry module. The ATLAS will energize and go into startup phase. The
RUN Light on the PLC will turn amber.
After startup is complete, the test screen appears, and the RUN light on the PLC
turns green.
The Atlas can be powered off at any time by turning off the switch on the power
entry module.
ATLAS Operations and Maintenance Manual
6 OPERATION
17

Advertisement

Table of Contents
loading

Table of Contents