SPX FLOW
SPX FLOW_CU4.plus. 24V Direct Connect_IECEx_Zone 2_GB-1_012024_for D4. Valves.indd
12
2.
Safety Instructions
2.4.
Welding instructions
It is generally recommended to avoid welding work in process
!
installation in which control units are installed and connected.
If welding is nonetheless required, earthing of the electrical
devices in the welding area is a necessity.
2.5.
Persons
-
Installation and maintenance work may only be carried out by
qualified personnel and by means of appropriate tools.
!
-
Qualified personnel must get a special training with regard to
possible risks and must know and observe the safety instructions
indicated in the instruction manual.
-
Work at the electrical installation may only be carried out by
personnel specialized in electrics!
2.6.
Warranty
This document does not contain any warranty acceptance.
We refer to our general terms of sale and delivery.
Prerequisite for a guarantee is the correct use of the unit in
compliance with the specified conditions of application.
Note!
This warranty only applies to the Control Unit.
No liability will be accepted for consequential
damage of any kind arising from failure or
malfunction of the device.
GB
Control Unit
CU4plus Direct Connect
Instruction Manual GB-0
Need help?
Do you have a question about the APV CU4 plus and is the answer not in the manual?
Questions and answers