Hardware installation
February 2024
2. Open the equalize valve on the high pressure (upstream) side of the transmitter.
3. Open the equalize valve on the low pressure (downstream) side of the transmitter.
56
A. High
B. Low
C. Test (plugged)
D. Equalize (open)
E. Equalize (closed)
F. Isolate (open)
G. Isolate (closed)
H. Process
I. Drain vent (closed)
The manifold is now in the proper configuration for zeroing the transmitter.
A. High
B. Low
C. Test (plugged)
D. Equalize (open)
E. Isolate (open)
F. Isolate (closed)
G. Process
H. Drain vent (closed)
Reference Manual
00809-0100-4107
Rosemount 2051