Hardware installation
February 2024
A. High
B. Low
C. Drain/vent valve
D. Isolate (open)
E. Equalize (closed)
F. Process
Procedure
1. To zero the transmitter, close the isolate valve to the low pressure (downstream)
52
side of the transmitter first.
A. High
B. Low
C. Drain/vent valve
D. Equalize (closed)
E. Isolate (open)
F. Isolate (closed)
G. Process
Reference Manual
00809-0100-4107
Rosemount 2051